PRODUCT SHOW
1. Speed is controlled by frequency converter, easy to control and more rel
2.Simple installation , easy maintenance and easy to clean .
APPLICATION
The conveyor is applicable for vertical lifting of granule material such as corn,jerry, snack, candy , nuts, plastic and chemical product, small hardware ,vegetable ,fruit and so on. For this machine, the bucket is driven by the chains to lift.
MAIN FUNCTION
1. 304 stainless steel frame.
2. Single t-slot down the length of the frame, per side.
3. 20 gauge 304 stainless steel slider bed.
4. belt width is approximately 150 mm (200 mm less when using side-walled belt) less the frame width.
5. Maintenance free dual-sealed ball bearings.
6. Mid-drives are only permitted with non-cleat belts.
7. Dual top-side guides provide excellent belt tracking through the bend assemblies.
8. Available in a wide variety of configurations
Incline to horizontal
Horizontal to incline
Horizontal to incline to horizontal
And many more.
9. Belts are laterally stiff to provide excellent product supports at the bends.
10. Choose from either an external side rail or sidewalls integrated onto the belt.
TECHNICAL SPECIFICATION
Model |
ZH-CF
3-7m*/h
70L/110L/ 340 LOption
0.75KW AC 220V/AC 380V,50Hz;
450kg |
Frame Materia
|
304SS |
Belt material
|
PP/PVC /PU(Food grade) |
Belt width
|
300/450mm (Can Customized) |
Height
|
3480 mm(Can Customized) |
Capacity
|
3-7m*/h |
Storage Hopper volun
|
70L/110L/ 340 LOption |
Power parameter
|
0.75KW AC 220V/AC 380V,50Hz; |
Weight |
450kg |
CERTIFICATION
EXHIBITION
RFQ
Q1: Are you the factory or trading company ?
A1: We are factory, packaging machinery manufacturer, selling all around the world and models are hot sales in America, Germany,Austrial and so on, getting high appreciated from our customers.
Q2: What kinds of bags can be packed ?
A2: We have many kinds of bags, such as pillow bag, back sealing gusset bag, side sealing gusset bag, four seal bag, "M" bag,triangle bag and so on.
Q3: How about the MOQ of completed packaging machine ?
A3: 1 sets.
Q4: May i purchase the packaging machinery spare parts too ?
Q4: Sure, highly appreciated.
Q5: What is the delivery date ?
A5: If materials are in stock, delivery date is about 20-25days. If not, delivery date is about 40-50days.
Q6: Why would choose ZONPACK?
A6: We have strong R&D team and aftersales service, any questions just feel free to contact with us.